We were contracted to build the jetty based on the design provided by the owner. The job started in September 2012 and completed timely in September 2013. The jetty is part of AKR's fuel farm in Madidir near Bitung, North Sulawesi. It not only pipes fuel directly to the tank farm on the shore but also allows fuel trucking on the jetty. The jetty can berth vessel up to 20,000-DWT.